新房装饰超全房子装饰流程 - 疑问解答
公司简介 | 加入收藏 您好!欢迎来到济南骏达装饰有限公司官方网站!

效果图展示

当前位置:Product

首页 > 新闻动态 > 疑问解答 >
新房装饰超全房子装饰流程
New house decoration super house decoration process
新房装饰让人既振奋又忧虑,振奋的是总算有了自己的房子,而且可按自己的志愿将房子装饰自己喜爱的样子,忐忑的是对新房装饰流程完全不了解,很简单出差错。假如你对装饰不是内行,主张仍是找一家装饰公司来做。假如资金不充足,主张仍是多参阅他人的计划,自己做规划,能够省去规划费。
The decoration of the new house is both exciting and worrying. The exciting thing is that at last we have our own house, and we can decorate the house as we like. It's a simple mistake because we don't understand the decoration process of the new house at all. If you are not expert in decorating, you should still look for an adornment company to do it. If the funds are not sufficient, it is still more likely to refer to other people's plans and make their own plans to save the cost of planning.
1.量房规划
1. housing planning
不管新房,仍是老房,装饰前第一步就是需要对房子进行一次具体的丈量,以清晰装饰过程中触及的尺度、面积及家具家电摆放方位,如贴砖面积、墙顶面漆面积、壁纸面积、地板面积等等。量房后就能够开端进行规划了,断定好房子规划风格,剖析规划中的难点,统计好所需的装饰主辅材数量等。
Regardless of the new house, is still the old house, the first step before decoration is to carry out a specific measurement of the house, in order to clear the decoration process touched the scale, area and furniture appliances location, such as tile area, wall top paint area, wallpaper area, floor area and so on. After measuring the house, we can start planning, determine the style of house planning, analyze the difficulties in planning, and count the number of decorative main and auxiliary materials.
2.厨卫吊顶及橱柜装置
2. kitchen and bathroom ceiling and cabinet device
油工完工后,装饰硬装部分就根本完毕了,此刻进入装置阶段了。厨卫吊顶,包含防潮吸顶灯、排风扇及浴霸,最好一次性完结。橱柜装置触及到水槽和煤气灶,装置前需联络物业把煤气通了,安好煤气灶后需试气。
After the completion of the oil worker, the hard fitting part is completely finished, and now it is in the installation stage. Kitchen and bathroom ceiling, including dampproof ceiling lamp, exhaust fan and bath bully, is the best time to end. The cabinet device touches the sink and the gas stove. Before the device, the property should be contacted to clear the gas. After installing the gas stove, the gas should be tested.
3.木门装置
3. wooden door device
木门需提早预订,一般与窗套、垭口一同丈量,等橱柜装置完,就能够进行木门装置了,需将合页、门锁、地吸五金配件同时装置好。
Wooden doors need to be reserved in advance, and generally with the window cover, measurements, and so on cabinet device, can be installed wooden doors, the door lock, to suck hardware fittings at the same time.
4.地板装置
4. floor unit
木门装置好之后,就能够着手装置地板了,地板装置前务必承认地上是否平坦、洁净、枯燥。地板装置时要预留缩缝,除了地板与墙面之间要预留出1cm左右的地板伸缩缝。地板间的缝隙也要预留缝隙,一般不超越1mm,密度较高的地板铺设时,每块应留有0.4mm的间隙,以防日后起拱变形。
After the wooden door is installed, the floor can be installed. Before the floor is installed, be sure to admit that the ground is flat, clean and boring. When the floor device to reserve contraction joints, in addition to the floor and the wall between the floor to reserve about 1 cm floor expansion joints. The gap between the floors should also be reserved, generally not more than 1 mm, when the density of higher floor laying, each should leave a gap of 0.4 mm, in order to prevent future arch deformation.
5.壁纸铺贴
5. wallpaper paving
地板装置完后,将房子全体进行一次完全整理,坚持室内洁净,地板维护,就能够铺贴壁纸了。壁纸铺贴前,最好先在墙上涂一层聚酯油漆,防止壁纸受潮发霉;铺贴时需备好洁净毛巾,以把多与的胶液处理洁净。铺贴完,壁纸枯燥需坚持室内杰出通风。
After the flooring is installed, the whole house is completely tidied up once, and the room is kept clean and the floor is maintained so that wallpaper can be laid. Before the wallpaper is laid, it is better to apply a layer of polyester paint on the wall to prevent the wallpaper from dampness and mildew; when the wallpaper is laid and pasted, clean towels should be prepared to clean the glue mixture. When the paving is finished, the wallpaper is dry.
济南家装装修公司
6.散热器装置
6. radiator device
壁纸铺贴完后,就能够按照散热器了,这是本着谁脏谁先上的准则,木门——地板——壁纸——散热器是遍及被认可的装置次序。
After the wallpaper shop is pasted, the radiator can be used in accordance with the principle of who gets dirty first, and the wooden doors - floor - Wallpaper - radiator is pervasive in the approved installation sequence.
7.开关插座、灯具装置
7. switch socket and lamp installation
业主装饰时,需对各个空间里的开关插座数量和方位了然指掌,以防在壁纸铺贴中工人忘掉留空标明,一下子把壁纸全体贴上去。等于灯具装置需注意安全,装置前最好关掉电闸断电,装置好后通电查看。
Owners need to know the number and orientation of switch sockets in each space when decorating, in order to prevent workers in the wallpaper shop to forget to leave empty markings, all the wallpaper pasted up. It is equal to the safety of lamps and lanterns. It is better to turn off the switch and turn off the electricity before installing the device.
8..装置五金洁具、窗布杆
8.. Hardware hardware and window cloth pole
五金洁具包含水槽、龙头、锁具、上下水管件、马桶、晾衣架等等,选择前需注意类型的匹配性,最好购买同一品牌一整套的,防止丢失。然后就能够装置窗布杆了,窗布杆装置前,首要需断定其装置方位。即装置高度与宽度。窗布杆的宽度能够由窗户的宽度决议,比窗户宽度两边都多出20-30cm。窗布杆的装置高度则有清楚杆和暗杆不同,明杆的装置高度在吊顶到窗框上方的中心方位,暗杆则在窗布箱内的顶部,或侧装在窗布箱内恣意部位。
Hardware sanitary ware includes sink, tap, lock, water pipe fittings, toilet, clothes hanger and so on. It is better to buy a complete set of the same brand to prevent loss before choosing. Then you can install the window bar. Before the window bar device, the position of the device must be determined. That is the height and width of the device. The width of the window bar can be determined by the width of the window, which is more than 20-30cm on both sides of the width of the window. The device height of the window cloth pole is different from that of the dark pole. The device height of the bright pole is in the central position from the ceiling to the top of the window frame. The dark pole is in the top of the window cloth box, or in the arbitrary part of the window cloth box.
济南骏达装饰有限公司,对济南家装装修公司感兴趣的朋友可以关注我们http://www.jundazhuangshi.com,更多精彩家庭装修内容敬请期待。
Jinan Junda Decoration Co., Ltd., the Jinan decoration company interested in friends can pay attention to our http://www.jundazhuangshi.com, more wonderful home decoration content please look forward to.


上一篇:济南家装装饰空调装置方位应充分考虑空间方位和布局
下一篇:济南家庭装修的注意事项
  • 装修材料的通用...
  • 家装窗户要用断...
  • 客厅装饰的一些...
  • 济南家装装修的...
  • 济南家装装饰空...
    • 返回顶部
    • 15806619313
    • 微信二维码
      关注你附近