装修延期的常见原因有哪些? - 新闻信息
公司简介 | 加入收藏 您好!欢迎来到济南骏达装饰有限公司官方网站!

效果图展示

当前位置:Product

首页 > 新闻动态 > 新闻信息 >
  秋冬装修旺季,很多家庭都希望能在年底前住上新房。然而,实际情况并不乐观,许多本应完成的工程,由于种种原因,竣工日期还很遥远。下面我们来看看选择小企业装修延误的常见原因有哪些。下面这些都不是问题。
  In the autumn and winter decoration season, many families hope to live in a new house before the end of the year. However, the actual situation is not optimistic, many projects should be completed, due to various reasons, the completion date is still far away. Next let's see what are the common reasons for delays in choosing small business renovation. These are not problems.
  原因1:工艺安排或人员配置不合理
  Reason 1: unreasonable process arrangement or staffing
  装修是一个比较复杂的工程,需要整合各种资源,从而实现设计、施工、家居配置一体化的过程。而在这个过程中,需要做的事情又琐碎又复杂,这就需要选择具有优秀管理能力的装饰公司。很多装修延迟项目源于很多家装公司片面追求订单,而对施工、安装等的调度能力没有合理的分析,最终导致很多项目在实施中与协议脱节。(拥有施工队伍,合理控制和部署劳动合同制度)
  Decoration is a relatively complex project, which requires the integration of various resources to achieve the integration of design, construction and household allocation. In this process, the need to do things is trivial and complex, which requires the choice of decoration companies with excellent management capabilities. Many decoration delay projects originate from the one-sided pursuit of orders by many home decoration companies, but there is no reasonable analysis of the dispatching capacity of construction, installation and so on, which eventually leads to many projects being out of touch with the agreement in implementation. (Have a construction team, reasonably control and deploy the labor contract system)
  延迟原因2:装修方案不断变化
  Reasons for delays 2: Changing decoration schemes
  在施工初期,装修设计方案的变更是造成延误的一大原因。其中,有些改动是业主前期未明确确认,等到施工后才觉得不妥而要求更改;可能有装修公司为了增加预算,设计师或施工队等各种原因。(有自己的预算部门,在建设初期已经进行了适当的调整,在建设过程中没有不断的修改计划)
  In the early stage of construction, the change of decoration design scheme is a major cause of delay. Among them, some of the changes are not clearly confirmed by the owners in the early stage, and they are not considered appropriate until the construction; there may be decoration companies in order to increase the budget, designers or construction teams and other reasons. (Has its own budget department, in the early stage of construction has been properly adjusted, in the construction process, there is no continuous revision plan)
  原因三:主要材料未能按时入库
  Reason 3: Major materials can not be stored on time
  现在很多业主都选择半包装修,装修公司主要负责施工和基本的辅助材料,而主要材料需要业主购买。如果主要材料不能按时进入现场,施工时间可能不得不推迟。此外,装修工人可能会因为工期被打乱而继续拖延工期。(所有主要物料由南汇仓库配送,没有无法按时采购的主要物料)
  Now many owners choose semi-packaging repair, decoration companies are mainly responsible for construction and basic auxiliary materials, and the main materials need to be purchased by owners. If the main materials can not enter the site on time, the construction time may have to be delayed. In addition, decoration workers may continue to delay due to the disruption of the time limit. (All major materials are distributed by Nanhui Warehouse, and there are no major materials that cannot be purchased on time.)
济南家装装修公司
  原因4:验收不及时或工程款项未及时结算
  Reason 4: Inspection and acceptance are not timely or project funds are not settled in time
  装修中,有一些需要业主进行验收的水电工程才可以进行下一步施工。而且很多时候,由于业主很忙,在验收的时候自己走自己的路去现场签收确认,所以验收的时间会被耽误;另外,有些装修工程的付款方式是分期付款,如果业主没有及时结算一期工程款项,施工可能会暂停,造成装修延误。
  In the decoration, there are some hydropower projects which need the owner's acceptance before the next construction can be carried out. And many times, because the owners are very busy, when acceptance, they go to the site to sign for confirmation, so the time of acceptance will be delayed; in addition, some decoration projects are paid in installments, if the owners do not settle the first phase of the project in time, construction may be suspended, resulting in delays in decoration.
  原因5:施工质量不合格造成返工
  Reason 5: Rework due to unqualified construction quality
  装修中,业主发现施工方以次为主,验收不合格时可要求重新整改,因此,对其他工序或工种造成时间上的延误和不可避免的造成影响。(隐蔽工程终身免费保修)
  In the decoration, the owner finds that the construction side is the second most important, and when the acceptance is not up to standard, the owner may ask for reorganization. Therefore, it will cause time delay and unavoidable impact on other processes or types of work. (Lifetime free warranty for covert works)